Bridge Toll Increase:  Project/Proposal Chart
Below is a chart of the proposed projects and proposals:
 
System-Wide
Project/Proposal

Request (millions 2002$)

Capital

Annual Net Operating

Appl. Needed

 

Spare Ferry Vessels (WTA)

$20.0

$0.0

 

San Francisco Ferry Terminal (WTA)

$20.0

$0.0

 

WTA Planning, Administration, Environmental

$0.0

$4.0

 

BART Capacity:

AATC, vehicles, engineering studies, TransLink®/AFC

$170.0

$3.0

 

BART Transbay Tube seismic (escalated $)

$200.0

$0.0

 

AC Transit BART Owl Service

$0.0

$2.0

 

TransLink® (includes MTC, BART, Muni requests)

$68.0

$2.0

 

City Car Share

$3.0

$0.0

 

Real-Time Transit Traveler Information (includes Muni, Caltrans Rte. 92 requests)

$19.0

$1.8

 

RIDES Marketing Plan:

tax benefits, guaranteed ride home, vanpool subsidies, park and rides, carpool incentive pilot

$0.0

$5.0

 

Safe Routes to Transit (East Bay Bicycle Coalition and Transportation Land Use Coalition)*

$98.8

TBD

 

Subtotal System Wide Request

$598.8

$17.8

 

Estimated Revenue

$800.0

$60.0

 
 

Request as Percent of Estimated Revenue

75%

30%

 

* May be appropriate to assign to bridge corridors; operating cost given as 30-year total - need to annualize


Bay Bridge

Project/Proposal

Request (millions 2002$)

Capital

Annual Net Operating

Appl. Needed

 

Ferry Service: Alameda, Oakland, Albany

$40.0

$8.8

 

BART Capacity:

PH Crossover, outer C-line pkg, Ala, CC, SF station improvements

$95.0

$1.0

 

BART Access Improvements (Transit, Bicycle, Pedestrian)

$35.9

$7.8

 

Muni Rail/BRT Capacity Expansion:

3rd Street, Ph.1 IOS, Metro/Mission Bay, New Central Subway, Geary BRT

$315.0

$9.0

Y

Muni Historic Streetcar Capacity Expansion:

E-Line vehicles and term. loop

$10.0

$3.0

Y

Muni Bus Capacity Expansion:

Treasure Island, Mission Bay expansion

$115.0

$18.3

Y

AC Transit BRT and Enhanced Bus

$250.0

$11.0

 

AC Transit Enhanced Transbay Service

$17.7

$5.9

 

AC Transit Treasure Island Service

$1.0

$2.0

 

AC Transit Capital Infrastructure - Operating Facility

$40.0

$0.6

 

BART Oakland Airport Connector (Port of Oakland)

$45.0

$0.0

 

I-580 HOV Lane: Vasco to Tassajara (ACCMA)

$45.0

$0.0

 

BART Warm Springs Extension (ACCMA)

$45.0

$0.0

 

I-580 Corridor Rail Transit Expansion (ACCMA)

TBD

$0.0

 

North I-880 Operational and Safety Improvements (ACCMA)

$40.0

$0.0

 

Tranbay Terminal (includes Downtown Extension)

$300.0

$0.0

 

Transportation Improvements to Support Transit Villages (ACCMA)

$2.0

$0.0

 

Subtotal Bay Bridge Corridor Request

$1,396.6

$67.3

 

Share of System-wide Request (34.8%)

$208.4

$6.2

 

Total

$1,605.0

$73.5

 

Estimated Corridor Revenue (34.8%)

$278.4

$20.9

 

Request as Percent of Estimated Corridor Revenue

577%

352%

 

San Mateo-Hayward and Dumbarton Bridges

Project/Proposal

Request (millions 2002$)

Capital

Annual Net Operating

Appl. Needed

 

Ferry Service: Oyster Point/South SF, Redwood City (WTA)

$20.0

$3.0

 

AC Transit Transbay Bus

$1.0

$7.8

 

Dumbarton Rail/Union City Intermodal Station

$157.0

$7.1

 

San Mateo Bridge Reversible Lanes (Bay Crossings Study estimate)

$40.0

$0.7

 

Express Bus Infrastructure: (Caltrans)

HOV ramps and PnR at Rte 92 and Industrial or Hesperian; ramp improvement and PnR at I-580/Center

$36.2

$0.0

 

Dumbarton Bridge Bus Infrastructure Improvements:

East Bay HOV extension, HOV on-ramp, I-880/SR 84 HOV connector; West Bay interchange improvement, PnR, and transit hub

$215.0

   

Rte. 92 HOV Improvements to Support Express Bus (ACCMA)

$2.0

$0.0

 

Subtotal San Mateo-Hayward & Dumbarton Corridor Requests

$471.2

$18.6

 

Share of System-wide Request (19.6%)

$117.4

$3.5

 

Total

$588.6

$22.1

 

Estimated Corridor Revenue (19.6%)

$156.8

$11.8

 

Request as Percent of Estimated Corridor Revenue

375%

188%

 

Richmond-San Rafael Bridge

Project/Proposal

Request (millions 2002$)

Capital

Annual Net Operating

Appl. Needed

 

Golden Gate Transit Express Bus

$5.8

$4.3

 

SMART Rail Service

TBD

TBD

 

Richmond Bridge Bus Infrastructure Improvements:

I-580 WB to US 101 SB connector, PnR in San Rafael, PnR in Richmond

$72.0

$0.0

 

Port Sonoma/North Bay Ferry Service (Marin County)

$12.0

$2.1

 

Loop Bus Service for Central Marin County (assumes 30 years)

$2.5

$2.3

 

Novato Narrows HOV lanes (SCTA)

TBD

$0.0

Y

Subtotal Richmond Bridge Corridor Request

$92.3

$8.7

 

Share of System-wide Request (10.1%)

$60.5

$1.8

 

Total

$152.8

$10.5

 

Estimated Corridor Revenue (10.1%)

$80.8

$6.1

 

Request as Percent of Estimated Corridor Revenue

189%

173%

 

Carquinez Bridge

Project/Proposal

Request (millions 2002$)

Capital

Annual Net Operating

Appl. Needed

 

Ferry Service: Vallejo, Albany (WTA)

$30.0

$3.0

 

Ferry Service: Vallejo (STA)

$0.0

$30.0

Y

Capitol Corridor Rail Improvements

$55.0

$0.0

 

I-80 Transportation Alternatives Study (BART and Caltrans)

$2.0

$0.0

 

I-80 Carquinez Bridge Bus Infrastructure Improvements:

Expand PnRs at Curtola, Richmond Pkwy, Hilltop, and West Texas; new PnR at Red Top Road; extend HOV from SR4 to Crocket I/C; relocate & expand Hercules transit center; I-80/Richmond Pkwy interchange improvements;

$100.7

$0.0

 

NCTPA Vine Vallejo Express Bus Service

$0.2

$0.4

 

Solano and Contra Costa County Express Bus Service (operators, CMAs)

TBD

TBD

Y

Subtotal Carquinez Bridge Corridor Request

$187.9

$33.4

 

Share of System-wide Request (18.7%)

$112.0

$3.3

 

Total

$299.9

$36.7

 

Estimated Corridor Revenue (18.7%)

$149.6

$11.2

 

Request as Percent of Estimated Corridor Revenue

200%

327%

 

Antioch, Benicia-Martinez Bridges

Project/Proposal

Request (millions 2002$)

Capital

Annual Net Operating

Appl. Needed

 

e-BART (CCTA)

$110.0

$0.0

 

Capitol Corridor Rail Improvements

$55.0

$0.0

 

I-680 Corridor Studies (BART and Caltrans)

$2.0

$0.0

 

I-80/I-680 Interchange (STA)

$100.0

$0.0

Y

I-80 HOV lanes: I-505 to I-680 (STA)

$100.0

$0.0

Y

I-680 Benicia Bridge Bus Infrastructure Improvements:

WB SR4 to I-680 HOV connector: Benicia intermodal station; relocate and expand I-680/SR 4 PnR; Martinez Intermodal, Phase 3

$86.0

$0.0

 

I-680 Express Bus Service (CCCTA):

Martinez to Del Norte BART; Martinez to San Francisco; Martinez to Dublin BART

$5.6

$0.7

 

Solano and Contra Costa County Express Bus Service (operators, CMAs)

TBD

TBD

Y

Subtotal Antioch and Benicia-Martinez Corridor Requests

$458.6

$0.7

 

Share of System-wide Request (16.8%)

$100.6

$3.0

 

Total

$559.2

$3.6

 

Estimated Corridor Revenue (16.8%)

$134.4

$10.1

 

Request as Percent of Estimated Corridor Revenue

416%

36%

 

Update: 10/23/02 

 Copyright ©2002 Transportation and Land Use Coalition   510.740.3150     info@transcoalition.org